1508
More Report pages
Report Author: Hisham Medhat
1508
Share template with others
Report submitted for the FP20 Analytics ZoomCharts Challenge, January 2025. The report was built using the Airline Delays Dataset and includes ZoomCharts custom Drill Down PRO visuals for Power BI.
Author's description:
This Power BI report analyzes airline delays, providing insights into key factors affecting flight punctuality. It includes interactive visualizations on delay causes, airline performance, airport-specific trends, and seasonal variations. Users can explore metrics such as average delay times, most affected routes, and on-time performance rates, enabling data-driven decisions for optimizing airline operations and improving passenger experience.
Participate in data challenges, build and submit reports to get free template downloads.
Join CommunityMobile view allows you to interact with the report. To Download the template please switch to desktop view.
How to use a PBIX template
Preview the interactive report, download the PBIX file, open it in Power BI Desktop, and replace the same data connection with your own dataset.
Preview and download
Explore the report online and download the PBIX template file.
Open in Power BI Desktop
Open the downloaded PBIX file in Power BI Desktop.
Connect your data
Replace the sample data source with your own dataset.
Refresh and adjust
Refresh the model and update fields or visual were needed.
Save and share
Save your report and publish it for your audience.